Layout – Stage 1 – Beginnings

Trenches for the foundations of stage 1 loop. I decided on track fixed to concrete to help with child and dog proofing the track.

The plan was to have 100mm deep concrete foundations. This takes a lot of concrete! I reduced some sections to 75mm to reduce the work. I think future work will use a 50-60mm foundation.

First section down and drying!

Track set out and temporarily fixed with small amounts of "Landscape Liquid Nails" mastic.
   
   